Sudima Hotel and Office Building

This major step in the Christchurch rebuild included the construction of a brand new 5-star hotel and adjoining office building. Advanced Applicators was involved in this project from a very early stage, applying the intumescent coatings to the structural steel. The team were meticulous during their application as they were applying paint to exposed surfaces, therefore an architectural standard was required. At a later date our Passive Fire team started work fire rating the many service penetrations throughout the project. Due to the high occupancy and proximity of future guests, great care had to be taken to ensure correct installation, and that the QA was completed to a high standard.

2020 © Copyright Advanced Applicators - Passive Fire Protection | Site Map | Terms & Conditions